Planning pack for this site, £295Other options

Solar · United Kingdom

Kettering Energy Park

Operator irst Renewable Developments Limited

Application SubmittedData checked 16 November 2026Source record dated 27 May 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kettering Energy Park is a solar farm in Burton Latimer, Northamptonshire, United Kingdom. Its planning application (NK/2025/0167) went to North Northamptonshire on 17 March 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 45 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kettering Energy Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1545, Fire involving solar panels on a building under construction in Kettering, 5.9 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15452024Fire involving solar panels on a building under construction in Kettering5.9 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough7.3 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property24 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
irst Renewable Developments Limited
Location
Burton Wold Wind Farm (land adj), Wold Road, Burton Latimer, Northamptonshire, NN15 5PJ, United Kingdom
Planning authority
North Northamptonshire
Planning application
NK/2025/0167

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NK/2025/0167, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 17 March 2025 Planning application submitted

None found. The register holds no published incident that names Kettering Energy Park. If you know of one, report it (confidential reports are anonymised).

Has Kettering Energy Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kettering Energy Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kettering Energy Park?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2025.
Where is Kettering Energy Park?
In Burton Latimer, Northamptonshire, United Kingdom (postcode NN15 5PJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).