Solar · United Kingdom

Top Lodge Solar Farm

Operator First Renewable Developments

Planning Permission Expired5 MWData checked 16 November 2026Source record dated 27 May 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Top Lodge Solar Farm is a 5 MW solar farm in Burton Latimer, Northamptonshire, United Kingdom. Its planning application (KET/2015/0422) went to North Northamptonshire on 3 June 2015 and was granted on 29 July 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 45 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 9 other sites and 516 energy sites within 40 km for Top Lodge Solar Farm

Members see the sites and incidents around this one, and every record behind them.

FIRST RENEWABLE DEVELOPMENTS LIMITED (07540571), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
First Renewable Developments
Location
Top Lodge, Burton Wold Farm, Wold Road, Burton Latimer, Kettering, Northamptonshire, Northamptonshire, NN15 5PJ, United Kingdom
Planning authority
North Northamptonshire
Planning application
KET/2015/0422

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for KET/2015/0422, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 3 June 2015 Planning application submitted
  • 29 July 2015 Planning permission granted
  • 29 July 2020 Planning permission expired

None found. The register holds no published incident that names Top Lodge Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Top Lodge Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Top Lodge Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Top Lodge Solar Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2020.
Where is Top Lodge Solar Farm?
In Burton Latimer, Northamptonshire, United Kingdom (postcode NN15 5PJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).