Solar · United Kingdom

Welby Road Solar Farm

Operator First Renewable Developments

Planning Permission Expired5 MWData checked 16 November 2026Source record dated 27 May 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Welby Road Solar Farm is a 5 MW solar farm 3.7 km north-west of Melton Mowbray, Leicestershire, United Kingdom. Its planning application (15/00430/FUL) went to Melton on 11 June 2015 and was granted on 10 September 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 19 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 9 other sites and 498 energy sites within 40 km for Welby Road Solar Farm

Members see the sites and incidents around this one, and every record behind them.

FIRST RENEWABLE DEVELOPMENTS LIMITED (07540571), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
First Renewable Developments
Location
Fields 7329, 8218 And Top Fiel, 4900, 7900 Welby Road, Asfordby Hill, Melton Mowbray, Leicestershire, LE14 3R, United Kingdom
Planning authority
Melton
Planning application
15/00430/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00430/FUL, with what the planning evidence pack adds for this site.

Every application in Melton · Alerts for applications and incidents near here

  • 11 June 2015 Planning application submitted
  • 10 September 2015 Planning permission granted
  • 10 September 2018 Planning permission expired

None found. The register holds no published incident that names Welby Road Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Welby Road Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Welby Road Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Welby Road Solar Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2020.
Where is Welby Road Solar Farm?
3.7 km north-west of Melton Mowbray, Leicestershire, United Kingdom (postcode LE14 3R).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).