Latimer Solar Park

Operator First Renewable Developments

Awaiting Construction5 MWData checked 16 November 2026Source record dated 27 May 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Latimer Solar Park is a 5 MW solar farm in Burton Latimer, Northamptonshire, United Kingdom. Its planning application (KET/2015/0445) went to North Northamptonshire on 1 June 2015 and was granted on 3 August 2015. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 45 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

FIRST RENEWABLE DEVELOPMENTS LIMITED (07540571), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Latimer Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1545, Fire involving solar panels on a building under construction in Kettering, 5.9 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15452024Fire involving solar panels on a building under construction in Kettering5.9 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough7.2 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property24 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
First Renewable Developments
Location
Latimer Solar Park, Wold Road, Burton Latimer, Kettering, Northamptonshire, NN15 5PJ, United Kingdom
Planning authority
North Northamptonshire
Planning application
KET/2015/0445

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for KET/2015/0445, with what the planning evidence pack adds for this site.

Every application in North Northamptonshire · Alerts for applications and incidents near here

  • 1 June 2015 Planning application submitted
  • 3 August 2015 Planning permission granted
  • 3 August 2020 Planning permission expired

None found. The register holds no published incident that names Latimer Solar Park. If you know of one, report it (confidential reports are anonymised).

Has Latimer Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Latimer Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Latimer Solar Park?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2020.
Where is Latimer Solar Park?
In Burton Latimer, Northamptonshire, United Kingdom (postcode NN15 5PJ).