Planning application · Onshore wind · North Northamptonshire

Burton Wold Wind Farm - Northern Extension

Operational14.4 MWApplication KET/2012/0556Submitted 29 August 2012Granted 9 November 2012

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
KET/2012/0556
Planning authority
North Northamptonshire
County or area
Northamptonshire
Nation
England
Technology
Onshore wind
Capacity
14.4 MW
Status
Operational
Operator or applicant
John Laing Environmental Assets Group
Location
Burton Wold Wind Farm, Wold Road, Burton Latimer, NN15 5PU
Turbines
9
First operating
2014
  • 29 August 2012 Planning application submitted
  • 9 November 2012 Planning permission granted
  • 21 October 2013 Construction started
  • 1 August 2014 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1578, Wind turbine fire near Chumleigh in Devon, 40 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15782024Wind turbine fire near Chumleigh in Devon40 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm41 kmSignificant
EIR-20212022Wind turbine catches fire near Thorney in Lincolnshire47 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NN15 5PU is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North Northamptonshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.