Moel Maelogen A Phase 2

Operator John Laing Environmental Assets Group

Operational11.7 MWData checked 16 November 2026Source record dated 3 May 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Moel Maelogen A Phase 2 is a 11.7 MW wind farm 18 km south of Colwyn Bay, Gwynedd, United Kingdom. Its planning application (0/27445) went to Conwy on 12 June 2003 and was granted on 26 November 2004. It has been operating since 1 October 2008. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 13 other sites and 68 energy sites within 40 km for Moel Maelogen A Phase 2

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
11.7 MW (this record)
All phases
14.3 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
John Laing Environmental Assets Group
Location
Moel Maelogen, Nr Llanrwst, Conwy, Gwynedd, Gwynedd, United Kingdom
Planning authority
Conwy
Planning application
0/27445
First operating
2008
Turbines
8

This record is 11.7 MW, one part of a site built in phases. With Moel Maelogen A (2.6 MW) the phases on the register add up to 14.3 MW. Moel Maelogen A

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 0/27445, with what the planning evidence pack adds for this site.

Every application in Conwy · Alerts for applications and incidents near here

  • 12 June 2003 Planning application submitted
  • 26 November 2004 Planning permission granted
  • 1 October 2008 Operational

None found. The register holds no published incident that names Moel Maelogen A Phase 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Moel Maelogen A Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Moel Maelogen A Phase 2; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Moel Maelogen A Phase 2?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2017.
Where is Moel Maelogen A Phase 2?
18 km south of Colwyn Bay, Gwynedd, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).