New Albion Wind Farm
Operator John Laing Environmental Assets Group
Operational14.4 MWData checked 16 November 2026Source record dated 25 August 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
New Albion Wind Farm is a 14.4 MW wind farm 4.6 km east of Desborough, Northamptonshire, United Kingdom. Its planning application (KET/2009/0549) went to North Northamptonshire on 29 August 2009 and was granted on 20 January 2010. It has been operating since 18 January 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 49 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when New Albion Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 14.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- John Laing Environmental Assets Group
- Location
- Agricultural land at Towns Close Farm, between Pipewell and Rushton and close to the A6003 Road to Corby, Northamptonshire, NN14 1QT, United Kingdom
- Planning authority
- North Northamptonshire
- Planning application
- KET/2009/0549
- First operating
- 2016
- Turbines
- 7
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for KET/2009/0549, with what the planning evidence pack adds for this site.
Every application in North Northamptonshire · Alerts for applications and incidents near here
Timeline
- 29 August 2009 Planning application submitted
- 20 January 2010 Planning permission granted
- 1 January 2015 Construction started
- 18 January 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names New Albion Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has New Albion Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names New Albion Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of New Albion Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 August 2016.
- Where is New Albion Wind Farm?
- 4.6 km east of Desborough, Northamptonshire, United Kingdom (postcode NN14 1QT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).