Solar · United Kingdom
Gaultney Solar Park
Operator United Photovoltaics
Operational20.5 MWData checked 16 November 2026Source record dated 4 October 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Gaultney Solar Park is a 20.5 MW solar farm on the edge of Desborough, Northamptonshire, United Kingdom. Its planning application (KET/2014/0391) went to North Northamptonshire on 17 June 2014 and was granted on 5 September 2014. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 44 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Gaultney Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 20.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- United Photovoltaics
- Location
- Gaultney Farm, Pipewell Road, Desborough, Northamptonshire, NN14 2SW, United Kingdom
- Planning authority
- North Northamptonshire
- Planning application
- KET/2014/0391
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for KET/2014/0391, with what the planning evidence pack adds for this site.
Every application in North Northamptonshire · Alerts for applications and incidents near here
Timeline
- 17 June 2014 Planning application submitted
- 5 September 2014 Planning permission granted
- 1 December 2014 Construction started
- 31 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Gaultney Solar Park. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Gaultney Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Gaultney Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Gaultney Solar Park?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 October 2016.
- Where is Gaultney Solar Park?
- On the edge of Desborough, Northamptonshire, United Kingdom (postcode NN14 2SW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).