Solar · United Kingdom
Egmanton Solar Farm
Operator United Photovoltaics
Operational14.2 MWData checked 16 November 2026Source record dated 4 October 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Egmanton Solar Farm is a 14.2 MW solar farm 7 km east of Boughton, Nottinghamshire, United Kingdom. Its planning application (14/00975/FULM) went to Newark and Sherwood on 5 June 2014 and was granted on 23 July 2014. It has been operating since 30 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Egmanton Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 14.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- United Photovoltaics
- Location
- Land Between Weston Road, And The A1, Egmanton, Nottinghamshire, NG22 0HB, United Kingdom
- Planning authority
- Newark and Sherwood
- Planning application
- 14/00975/FULM
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/00975/FULM, with what the planning evidence pack adds for this site.
Every application in Newark and Sherwood · Alerts for applications and incidents near here
Timeline
- 5 June 2014 Planning application submitted
- 23 July 2014 Planning permission granted
- 1 December 2014 Construction started
- 30 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Egmanton Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Egmanton Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Egmanton Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Egmanton Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 October 2016.
- Where is Egmanton Solar Farm?
- 7 km east of Boughton, Nottinghamshire, United Kingdom (postcode NG22 0HB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).