Awaiting Construction42.7 MWData checked 16 November 2026Source record dated 6 June 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

High Marnham - Solar Photovoltaic Farm is a 42.7 MW solar farm 12 km east of Boughton, Nottinghamshire, United Kingdom. Its planning application (22/00707/FUL) went to Bassetlaw on 17 May 2022 and was granted on 5 January 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for High Marnham - Solar Photovoltaic Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 31 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster31 kmSignificant
EIR-12652024Solar panels catch fire and destroy three buildings in Harby40 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine43 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
42.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
J G Pears Property Limited
Location
Adj Former High Marnham Power Station High Marnham, Nottinghamshire, NG23 6SH, United Kingdom
Planning authority
Bassetlaw
Planning application
22/00707/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00707/FUL, with what the planning evidence pack adds for this site.

Every application in Bassetlaw · Alerts for applications and incidents near here

  • 17 May 2022 Planning application submitted
  • 5 January 2023 Planning permission granted
  • 5 January 2026 Planning permission expired

None found. The register holds no published incident that names High Marnham - Solar Photovoltaic Farm. If you know of one, report it (confidential reports are anonymised).

Has High Marnham - Solar Photovoltaic Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Marnham - Solar Photovoltaic Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Marnham - Solar Photovoltaic Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 June 2022.
Where is High Marnham - Solar Photovoltaic Farm?
12 km east of Boughton, Nottinghamshire, United Kingdom (postcode NG23 6SH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).