Planning pack for this site, £295Other options

Battery storage · United Kingdom

One Earth Solar Farm

Operator Orsted UK Limited & PS Renewables

Awaiting ConstructionData checked 16 November 2026Source record dated 13 July 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

One Earth Solar Farm is a battery storage site 13 km east of Boughton, Nottinghamshire, United Kingdom. Its planning application (EN010159) went to The Planning Inspectorate - National Infrastructure on 27 February 2025 and was granted on 8 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for One Earth Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells25 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool142 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire184 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Orsted UK Limited & PS Renewables
Location
High Marnham, The border of Nottinghamshire, Newark, Nottinghamshire, NG23 6SF, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010159

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010159, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 27 February 2025 Planning application submitted
  • 8 July 2026 Planning permission granted
  • 8 July 2031 Planning permission runs out

None found. The register holds no published incident that names One Earth Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has One Earth Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names One Earth Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of One Earth Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2026.
Where is One Earth Solar Farm?
13 km east of Boughton, Nottinghamshire, United Kingdom (postcode NG23 6SF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).