← Back to Cumbria

Energy sites / United Kingdom / Cumbria

Solar · United Kingdom

Aspatria

Operational19 MWChecked 6 October 2026Last changed in the dataset 4 October 2016

Technology
Solar
Capacity
19 MW
Status
Operational
Operator or applicant
United Photovoltaics
Location
Pasture Farm, Westnewon Road, Aspatria, Wigton, Cumbria, Cumbria, CA7 3JU, United Kingdom
Planning authority
Cumberland
Planning application
2/2014/0468
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 2 July 2014 Planning application submitted
  • 18 November 2014 Planning permission granted
  • 1 December 2014 Construction started
  • 30 March 2015 Operational

None found. The register holds no published incident that names Aspatria. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.