← Back to Cumbria
Planning pack for this site, £295Other options

Solar · United Kingdom

Pow Motey, Langrigg - Solar Panels & Batteries Storage

Operator J W Gate & Son

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 18 May 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pow Motey, Langrigg - Solar Panels & Batteries Storage is a 0.3 MW solar farm 9.3 km west of Wigton, Cumbria, United Kingdom. Its planning application (REJ/2022/0003) went to Cumberland on 4 May 2022 and was granted on 11 June 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pow Motey, Langrigg - Solar Panels & Batteries Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 158 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool158 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells235 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire355 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
J W Gate & Son
Location
Pow Motey, Langrigg, Cumbria, CA7 3LH, United Kingdom
Planning authority
Cumberland
Planning application
REJ/2022/0003

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for REJ/2022/0003, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 4 May 2022 Planning application submitted
  • 11 June 2022 Planning permission granted

None found. The register holds no published incident that names Pow Motey, Langrigg - Solar Panels & Batteries Storage. If you know of one, report it (confidential reports are anonymised).

Has Pow Motey, Langrigg - Solar Panels & Batteries Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pow Motey, Langrigg - Solar Panels & Batteries Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pow Motey, Langrigg - Solar Panels & Batteries Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 May 2022.
Where is Pow Motey, Langrigg - Solar Panels & Batteries Storage?
9.3 km west of Wigton, Cumbria, United Kingdom (postcode CA7 3LH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).