← Back to Cumbria

Energy sites / United Kingdom / Cumbria

Onshore wind · United Kingdom

Westnewton

Operational6.2 MWChecked 6 October 2026Last changed in the dataset 21 July 2014

Technology
Onshore wind
Capacity
6.2 MW
Status
Operational
Operator or applicant
Broadview Energy Limited
Location
Warwick Hall Farm, Westnewton, Cumbria. CA7 3PF, Cumbria, United Kingdom
Planning authority
Cumberland
Planning application
2/2008/0997
Appeal reference
APP/GO908/A/10/2132949
First operating
2014
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 24 December 2008 Planning application submitted
  • 2 July 2010 Planning permission refused
  • 4 February 2011 Planning permission granted
  • 4 February 2011 Appeal granted
  • 17 September 2013 Construction started
  • 1 May 2014 Operational

None found. The register holds no published incident that names Westnewton. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.