Onshore wind · United Kingdom

Mynydd Pen-y-Graig Wind Farm

Operator Ventient (formerly Infinis)

Application Withdrawn15 MWData checked 16 November 2026Source record dated 1 September 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mynydd Pen-y-Graig Wind Farm is a 15 MW wind farm on the edge of Tonypandy, Rhondda Cynon Taff, United Kingdom. Its planning application (15/0831/10) went to Rhondda Cynon Taf on 18 June 2015 and was withdrawn on 17 August 2016. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 46 other energy sites within 10 km, 27 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 393 energy sites within 40 km for Mynydd Pen-y-Graig Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
15 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Ventient (formerly Infinis)
Location
Mynydd Penygraig, Pen-y-Graig, Cardiff, South Glamorgan, Rhondda Cynon Taff, CF24, United Kingdom
Planning authority
Rhondda Cynon Taf
Planning application
15/0831/10
Turbines
5, 115 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/0831/10, with what the planning evidence pack adds for this site.

Every application in Rhondda Cynon Taf · Alerts for applications and incidents near here

  • 18 June 2015 Planning application submitted
  • 17 August 2016 Application withdrawn

None found. The register holds no published incident that names Mynydd Pen-y-Graig Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mynydd Pen-y-Graig Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Pen-y-Graig Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Mynydd Pen-y-Graig Wind Farm?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 1 September 2016.
Where is Mynydd Pen-y-Graig Wind Farm?
On the edge of Tonypandy, Rhondda Cynon Taff, United Kingdom (postcode CF24).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).