Onshore wind · United Kingdom

Pant y wal

Operator Pennant Wind Energy Ventures (PWEV)

Operational25 MWData checked 16 November 2026Source record dated 3 June 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pant y wal is a 25 MW wind farm 3.6 km west of Tonypandy, Mid Glamorgan, United Kingdom. Its planning application (P/06/417/FUL) went to Bridgend on 31 March 2006 and was granted on appeal on 4 May 2011. It has been operating since 1 June 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 38 other energy sites within 10 km, 29 of them wind farms. The register holds one incident at this site, the latest in 2022.

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

The cause, the 1 linked record and 377 energy sites within 40 km for Pant y wal

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
25 MW (this record)
All phases
45 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Pennant Wind Energy Ventures (PWEV)
Location
Mynydd Maesteg, Mynydd Pwlle yr Helog, Ogmore Vale, Rhondda Valley, Mid Glamorgan, United Kingdom
Planning authority
Bridgend
Planning application
P/06/417/FUL
First operating
2013
Turbines
10, 115 m to tip

This record is 25 MW, one part of a site built in phases. With Pant y wal extension (20 MW) the phases on the register add up to 45 MW. Pant y wal extension

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/06/417/FUL, with what the planning evidence pack adds for this site.

Every application in Bridgend · Alerts for applications and incidents near here

  • 31 March 2006 Planning application submitted
  • 26 April 2006 Planning permission refused
  • 4 May 2011 Planning permission granted
  • 4 May 2011 Appeal granted
  • 1 April 2012 Construction started
  • 1 June 2013 Operational

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pant y wal had a fire or other incident?
Yes. The register holds one incident that names it: Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch (EIR-0794, 2022).
What is the status of Pant y wal?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 June 2013.
Where is Pant y wal?
3.6 km west of Tonypandy, Mid Glamorgan, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).