Onshore wind · United Kingdom
Pant y wal
Operator Pennant Wind Energy Ventures (PWEV)
Operational25 MWData checked 16 November 2026Source record dated 3 June 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Pant y wal is a 25 MW wind farm 3.6 km west of Tonypandy, Mid Glamorgan, United Kingdom. Its planning application (P/06/417/FUL) went to Bridgend on 31 March 2006 and was granted on appeal on 4 May 2011. It has been operating since 1 June 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 38 other energy sites within 10 km, 29 of them wind farms. The register holds one incident at this site, the latest in 2022.
Incidents on the register at this site
A 337ft (115m) wind turbine at the Pant-y-Wal wind farm near Gilfach Goch, Rhondda Cynon Taf, Wales, collapsed. Nearby residents reported hearing a noise like thunder as the turbine came down. The tower snapped roughly 60ft (18m) from its base, with the tower...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Pant y wal changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 25 MW (this record)
- All phases
- 45 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Pennant Wind Energy Ventures (PWEV)
- Location
- Mynydd Maesteg, Mynydd Pwlle yr Helog, Ogmore Vale, Rhondda Valley, Mid Glamorgan, United Kingdom
- Planning authority
- Bridgend
- Planning application
- P/06/417/FUL
- First operating
- 2013
- Turbines
- 10, 115 m to tip
This record is 25 MW, one part of a site built in phases. With Pant y wal extension (20 MW) the phases on the register add up to 45 MW. Pant y wal extension
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/06/417/FUL, with what the planning evidence pack adds for this site.
Every application in Bridgend · Alerts for applications and incidents near here
Timeline
- 31 March 2006 Planning application submitted
- 26 April 2006 Planning permission refused
- 4 May 2011 Planning permission granted
- 4 May 2011 Appeal granted
- 1 April 2012 Construction started
- 1 June 2013 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Pant y wal had a fire or other incident?
- Yes. The register holds one incident that names it: Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch (EIR-0794, 2022).
- What is the status of Pant y wal?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 June 2013.
- Where is Pant y wal?
- 3.6 km west of Tonypandy, Mid Glamorgan, United Kingdom.