Battery storage · United Kingdom

Upper Ogmore Wind Farm

Operator RES UK & Ireland Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 11 October 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Upper Ogmore Wind Farm is a battery storage site 4.6 km south-west of Treorchy, Mid Glamorgan, United Kingdom. Its planning application (DNS/3213662) went to Welsh Government (NSIP) on 2 November 2020 and was granted on 22 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 37 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Upper Ogmore Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 99 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter99 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire112 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool201 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
RES UK & Ireland Limited
Location
Upper Ogmore Wind Farm & Energy Storage Facility, Mid Glamorgan, CF32, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3213662

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3213662, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 2 November 2020 Planning application submitted
  • 22 September 2022 Planning permission granted

None found. The register holds no published incident that names Upper Ogmore Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Upper Ogmore Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Upper Ogmore Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Upper Ogmore Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 October 2022.
Where is Upper Ogmore Wind Farm?
4.6 km south-west of Treorchy, Mid Glamorgan, United Kingdom (postcode CF32).