Onshore wind · United Kingdom
Pant y Wal (Extension)
Operator Pennant Walters · Owner G. Walters (Holdings) Limited
Awaiting Construction5 MWData checked 16 November 2026Source record dated 16 August 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Pant y Wal (Extension) is a 5 MW wind farm 5.5 km west of Tonypandy, Mid Glamorgan, United Kingdom. Its planning application (P/20/42/FUL) went to Bridgend on 15 January 2020 and was granted on 9 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 28 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Pant y Wal (Extension) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PENNANT WALTERS (HOLDINGS) LIMITED (05633297), active, since 2005. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pant y Wal (Extension) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 4.4 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0794 | 2022 | Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch | 4.4 km | Significant |
| EIR-0874 | 2026 | Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales | 57 km | Significant |
| EIR-0790 | 2022 | Nordex attributes a Welsh wind turbine collapse to an overspeed condition | 78 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Pennant Walters
- Owner
- G. Walters (Holdings) Limited
- Location
- Pant y Wal Wind Farm, Ogmore, Bridgend, Mid Glamorgan, Mid Glamorgan, CF35 6EG, United Kingdom
- Planning authority
- Bridgend
- Planning application
- P/20/42/FUL
- Turbines
- 2, 125 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/20/42/FUL, with what the planning evidence pack adds for this site.
Every application in Bridgend · Alerts for applications and incidents near here
Timeline
- 15 January 2020 Planning application submitted
- 9 February 2023 Planning permission granted
- 9 February 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Pant y Wal (Extension). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Pant y Wal (Extension) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Pant y Wal (Extension); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Pant y Wal (Extension)?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2023.
- Where is Pant y Wal (Extension)?
- 5.5 km west of Tonypandy, Mid Glamorgan, United Kingdom (postcode CF35 6EG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).