Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Pant y Wal (Extension)

Operator Pennant Walters · Owner G. Walters (Holdings) Limited

Awaiting Construction5 MWData checked 16 November 2026Source record dated 16 August 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pant y Wal (Extension) is a 5 MW wind farm 5.5 km west of Tonypandy, Mid Glamorgan, United Kingdom. Its planning application (P/20/42/FUL) went to Bridgend on 15 January 2020 and was granted on 9 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 28 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

PENNANT WALTERS (HOLDINGS) LIMITED (05633297), active, since 2005. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pant y Wal (Extension) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 4.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch4.4 kmSignificant
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales57 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition78 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Pennant Walters
Owner
G. Walters (Holdings) Limited
Location
Pant y Wal Wind Farm, Ogmore, Bridgend, Mid Glamorgan, Mid Glamorgan, CF35 6EG, United Kingdom
Planning authority
Bridgend
Planning application
P/20/42/FUL
Turbines
2, 125 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/20/42/FUL, with what the planning evidence pack adds for this site.

Every application in Bridgend · Alerts for applications and incidents near here

  • 15 January 2020 Planning application submitted
  • 9 February 2023 Planning permission granted
  • 9 February 2027 Planning permission runs out

None found. The register holds no published incident that names Pant y Wal (Extension). If you know of one, report it (confidential reports are anonymised).

Has Pant y Wal (Extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pant y Wal (Extension); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Pant y Wal (Extension)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2023.
Where is Pant y Wal (Extension)?
5.5 km west of Tonypandy, Mid Glamorgan, United Kingdom (postcode CF35 6EG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).