Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Mynydd Carn Wind Farm

Operator Pennant Walters · Owner G. Walters (Holdings) Limited

Awaiting Construction34 MWData checked 16 November 2026Source record dated 10 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mynydd Carn Wind Farm is a 34 MW wind farm in Abertillery, Blaenau Gwent, United Kingdom. Its planning application (DNS/3270299) went to Welsh Government (NSIP) on 23 November 2022 and was granted on 11 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

PENNANT WALTERS (HOLDINGS) LIMITED (05633297), active, since 2005. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mynydd Carn Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch27 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition74 kmMajor
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales75 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
34 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Pennant Walters
Owner
G. Walters (Holdings) Limited
Location
Mynydd Carn, Y Cefn, Abertillery, Blaenau Gwent, NP4, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3270299
Turbines
8, 180 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3270299, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 23 November 2022 Planning application submitted
  • 11 March 2024 Planning permission granted

None found. The register holds no published incident that names Mynydd Carn Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Mynydd Carn Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Carn Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Mynydd Carn Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 February 2026.
Where is Mynydd Carn Wind Farm?
In Abertillery, Blaenau Gwent, United Kingdom (postcode NP4).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).