← Back to Grampian

Onshore wind · United Kingdom

Tibberchindy Wind Farm

Operator Ventient (formerly Infinis)

Application Refused18 MWData checked 16 November 2026Source record dated 13 March 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tibberchindy Wind Farm is a 18 MW wind farm 27 km west of Inverurie, Grampian, United Kingdom. Its planning application (APP/2012/3405) went to Aberdeenshire on 15 October 2012 and was refused on 4 February 2014. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 11 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 156 energy sites within 40 km for Tibberchindy Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Ventient (formerly Infinis)
Location
Coiliochbhar Hill, nr Tibberchindy Farmhouse 5km west of Alford, Aberdeenshire, Grampian, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2012/3405
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2012/3405, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 15 October 2012 Planning application submitted
  • 4 February 2014 Planning permission refused

None found. The register holds no published incident that names Tibberchindy Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tibberchindy Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tibberchindy Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Tibberchindy Wind Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 13 March 2014.
Where is Tibberchindy Wind Farm?
27 km west of Inverurie, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).