Under Construction46.2 MWApplication CL/17/0009Submitted 13 December 2016Granted 15 December 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
CL/17/0009
Planning authority
South Lanarkshire
County or area
Lanarkshire
Nation
Scotland
Technology
Onshore wind
Capacity
46.2 MW
Status
Under Construction
Operator or applicant
Muirhall Energy
Location
Priestgill Wind Farm, Little Gill Farm, Abington, Biggar, Strathclyde, ML12 6RW
Appeal reference
PPA-380-2075
Turbines
7, 200 m to tip
  • 13 December 2016 Planning application submitted
  • 16 August 2017 Planning permission refused
  • 14 November 2017 Appeal lodged
  • 7 December 2018 Appeal granted
  • 15 December 2021 Planning permission granted
  • 30 March 2024 Planning permission expired
  • 1 September 2025 Construction started

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 38 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm38 kmMajor
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow47 kmMajor
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow52 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near ML12 6RW is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Lanarkshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.