← Back to Strathclyde

Onshore wind · United Kingdom

Hunterston Test Centre (Phase 2)

Operator Scottish Enterprise/SSE

Application Withdrawn8 MWData checked 16 November 2026Source record dated 1 September 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hunterston Test Centre (Phase 2) is a 8 MW wind farm 7 km south of Largs, Strathclyde, United Kingdom. Its planning application (16/00060/PP) went to North Ayrshire on 28 January 2016 and was withdrawn on 4 August 2016. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 27 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 2 other sites and 259 energy sites within 40 km for Hunterston Test Centre (Phase 2)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Scottish Enterprise/SSE
Location
Hunterston Construction Yard, Fairlie Largs, Largs, Strathclyde, KA30 9AG, United Kingdom
Planning authority
North Ayrshire
Planning application
16/00060/PP
Turbines
1, 220 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 16/00060/PP, with what the planning evidence pack adds for this site.

Every application in North Ayrshire · Alerts for applications and incidents near here

  • 28 January 2016 Planning application submitted
  • 4 August 2016 Application withdrawn

None found. The register holds no published incident that names Hunterston Test Centre (Phase 2). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hunterston Test Centre (Phase 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hunterston Test Centre (Phase 2); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hunterston Test Centre (Phase 2)?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 1 September 2016.
Where is Hunterston Test Centre (Phase 2)?
7 km south of Largs, Strathclyde, United Kingdom (postcode KA30 9AG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).