Onshore wind · United Kingdom
Blantyre Muir Wind Farm extension
Operator West Coast Energy
Operational7.5 MWData checked 16 November 2026Source record dated 5 January 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Blantyre Muir Wind Farm extension is a 7.5 MW wind farm 3.7 km west of Meikle Earnock, Strathclyde, United Kingdom. Its planning application (HM/10/0478) went to South Lanarkshire on 4 October 2010 and was granted on 25 May 2012. It has been operating since 15 January 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 59 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Blantyre Muir Wind Farm extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 7.5 MW (this record)
- All phases
- 16.5 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- West Coast Energy
- Location
- Near Laigh Muirhouses Farm Muttonhole Road Hamilton, Strathclyde, United Kingdom
- Planning authority
- South Lanarkshire
- Planning application
- HM/10/0478
- First operating
- 2014
- Turbines
- 3
This record is 7.5 MW, one part of a site built in phases. With Blantyre Muir Wind Farm (9 MW) the phases on the register add up to 16.5 MW. Blantyre Muir Wind Farm
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for HM/10/0478, with what the planning evidence pack adds for this site.
Every application in South Lanarkshire · Alerts for applications and incidents near here
Timeline
- 4 October 2010 Planning application submitted
- 25 May 2012 Planning permission granted
- 4 June 2012 Construction started
- 15 January 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Blantyre Muir Wind Farm extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Blantyre Muir Wind Farm extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Blantyre Muir Wind Farm extension; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Blantyre Muir Wind Farm extension?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 January 2015.
- Where is Blantyre Muir Wind Farm extension?
- 3.7 km west of Meikle Earnock, Strathclyde, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).