Battery storage · United Kingdom
Muttonhole Road - Battery Storage
Operator Advanced Grid Solutions Limited
Awaiting Construction500 MWData checked 16 November 2026Source record dated 5 October 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Muttonhole Road - Battery Storage is a 500 MW battery storage site 3 km south of High Blantyre, Lanarkshire, United Kingdom. Its planning application (ECU00004957) went to Scottish Government (S36) on 4 April 2025 and was granted on 17 August 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Muttonhole Road - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Muttonhole Road - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 274 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 274 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 351 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 471 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 500 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Advanced Grid Solutions Limited
- Location
- Muttonhole Road, Brackenhill Park, Limekilnburn, Lanarkshire, ML3 8RJ, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00004957
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00004957, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 4 April 2025 Planning application submitted
- 17 August 2026 Planning permission granted
- 17 August 2031 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Muttonhole Road - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Muttonhole Road - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Muttonhole Road - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Muttonhole Road - Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 October 2026.
- Where is Muttonhole Road - Battery Storage?
- 3 km south of High Blantyre, Lanarkshire, United Kingdom (postcode ML3 8RJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).