← Back to Strathclyde

Onshore wind · United Kingdom

Enoch Hill

Operator E.ON Renewables

Operational70 MWData checked 16 November 2026Source record dated 4 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Enoch Hill is a 70 MW wind farm 11 km south of Cumnock, Strathclyde, United Kingdom. Its planning application (EC00005256) went to Scottish Government (S36) on 28 September 2015 and was granted on appeal on 13 September 2019. It has been operating since 16 April 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 29 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 2 other sites and 327 energy sites within 40 km for Enoch Hill

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
Wholesale

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 7,984 MWh, running 84% of half hours, peak 34 MW of 70, load factor 16%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £41,263 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
70 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
E.ON Renewables
Location
around 14km south west of New Cumnock, Strathclyde, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
EC00005256
Appeal reference
WIN-190-5
First operating
2026
Turbines
15, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EC00005256, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 28 September 2015 Planning application submitted
  • 21 November 2017 Appeal lodged
  • 13 September 2019 Planning permission granted
  • 13 September 2019 Appeal granted
  • 1 October 2023 Construction started
  • 16 April 2026 Operational

None found. The register holds no published incident that names Enoch Hill. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Enoch Hill had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Enoch Hill; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Enoch Hill?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 June 2026.
Where is Enoch Hill?
11 km south of Cumnock, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).