Onshore wind · United Kingdom

Tween Bridge Windfarm

Operator E.ON Renewables

Operational44 MWData checked 16 November 2026Source record dated 23 August 2012

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tween Bridge Windfarm is a 44 MW wind farm on the edge of Thorne, South Yorkshire, United Kingdom. Its planning application (04/0314/P/CIR2) went to Doncaster on 23 January 2004 and was granted on 28 February 2008. It has been operating since 27 February 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 2 other sites and 605 energy sites within 40 km for Tween Bridge Windfarm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
44 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
E.ON Renewables
Location
Tween Bridge, Thorne, Doncaster, South Yorks, South Yorkshire, DN8 5, United Kingdom
Planning authority
Doncaster
Planning application
04/0314/P/CIR2
First operating
2012
Turbines
22

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 04/0314/P/CIR2, with what the planning evidence pack adds for this site.

Every application in Doncaster · Alerts for applications and incidents near here

  • 23 January 2004 Planning application submitted
  • 28 February 2008 Planning permission granted
  • 1 May 2011 Construction started
  • 27 February 2012 Operational

None found. The register holds no published incident that names Tween Bridge Windfarm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tween Bridge Windfarm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tween Bridge Windfarm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Tween Bridge Windfarm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2012.
Where is Tween Bridge Windfarm?
On the edge of Thorne, South Yorkshire, United Kingdom (postcode DN8 5).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).