Planning pack for this site, £295Other options

Solar · United Kingdom

The Tween Bridge Solar Farm

Operator RWE

Application Submitted800 MWData checked 16 November 2026Source record dated 13 October 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Tween Bridge Solar Farm is a 800 MW solar farm on the edge of Thorne, South Yorkshire, United Kingdom. Its planning application (EN010148) went to The Planning Inspectorate - National Infrastructure on 26 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 21 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Tween Bridge Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster16 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof55 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton58 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
800 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
RWE
Location
Moor Owners Rd, Thorne, Doncaster, South Yorkshire, DN8 5RX, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010148

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010148, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 26 August 2025 Planning application submitted

None found. The register holds no published incident that names The Tween Bridge Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has The Tween Bridge Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Tween Bridge Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Tween Bridge Solar Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 13 October 2025.
Where is The Tween Bridge Solar Farm?
On the edge of Thorne, South Yorkshire, United Kingdom (postcode DN8 5RX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).