Onshore wind · United Kingdom
Harryburn Wind Farm
Operator RWE
Appeal Refused67 MWData checked 16 November 2026Source record dated 17 December 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Harryburn Wind Farm is a 67 MW wind farm 25 km south of Lanark, United Kingdom. Its planning application (EC00005277) went to Scottish Government (S36) on 17 May 2017 and was refused on appeal on 27 September 2019. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 18 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Harryburn Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 67 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- RWE
- Location
- 1.3km east of Leadhills, Leadhills Road, Elvanfoot, 1km south-west of Crawford, Biggar, Strathclyde, Lanarkshire, ML12 6TE, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- EC00005277
- Appeal reference
- WIN-380-1
- Turbines
- 16, 150 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EC00005277, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 17 May 2017 Planning application submitted
- 23 April 2018 Appeal lodged
- 27 September 2019 Planning permission refused
- 27 September 2019 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Harryburn Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Harryburn Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Harryburn Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Harryburn Wind Farm?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 17 December 2019.
- Where is Harryburn Wind Farm?
- 25 km south of Lanark, United Kingdom (postcode ML12 6TE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).