Battery storage · United Kingdom
Elvanfoot, Leadhills Road - Phase 3 - BESS
Operator Elvanfoot Energy Storage 3 Limited.
Application Submitted25 MWData checked 16 November 2026Source record dated 17 April 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Elvanfoot, Leadhills Road - Phase 3 - BESS is a 25 MW battery storage site 27 km south of Lanark, Strathclyde, United Kingdom. Its planning application (P/26/0324) went to South Lanarkshire on 26 March 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 15 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Elvanfoot, Leadhills Road - Phase 3 - BESS changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Elvanfoot, Leadhills Road - Phase 3 - BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 233 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 233 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 306 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 430 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 25 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Elvanfoot Energy Storage 3 Limited.
- Location
- 290m Nw/O 3 Leadhills Road, Elvanfoot, Biggar, Strathclyde, ML12 6TE, United Kingdom
- Planning authority
- South Lanarkshire
- Planning application
- P/26/0324
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/26/0324, with what the planning evidence pack adds for this site.
Every application in South Lanarkshire · Alerts for applications and incidents near here
Timeline
- 26 March 2026 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Elvanfoot, Leadhills Road - Phase 3 - BESS. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Elvanfoot, Leadhills Road - Phase 3 - BESS had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Elvanfoot, Leadhills Road - Phase 3 - BESS; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Elvanfoot, Leadhills Road - Phase 3 - BESS?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 17 April 2026.
- Where is Elvanfoot, Leadhills Road - Phase 3 - BESS?
- 27 km south of Lanark, Strathclyde, United Kingdom (postcode ML12 6TE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).