← Back to Strathclyde
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Elvanfoot, Leadhills Road - Phase 3 - BESS

Operator Elvanfoot Energy Storage 3 Limited.

Application Submitted25 MWData checked 16 November 2026Source record dated 17 April 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Elvanfoot, Leadhills Road - Phase 3 - BESS is a 25 MW battery storage site 27 km south of Lanark, Strathclyde, United Kingdom. Its planning application (P/26/0324) went to South Lanarkshire on 26 March 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 15 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Elvanfoot, Leadhills Road - Phase 3 - BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 233 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool233 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells306 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire430 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Elvanfoot Energy Storage 3 Limited.
Location
290m Nw/O 3 Leadhills Road, Elvanfoot, Biggar, Strathclyde, ML12 6TE, United Kingdom
Planning authority
South Lanarkshire
Planning application
P/26/0324

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/26/0324, with what the planning evidence pack adds for this site.

Every application in South Lanarkshire · Alerts for applications and incidents near here

  • 26 March 2026 Planning application submitted

None found. The register holds no published incident that names Elvanfoot, Leadhills Road - Phase 3 - BESS. If you know of one, report it (confidential reports are anonymised).

Has Elvanfoot, Leadhills Road - Phase 3 - BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Elvanfoot, Leadhills Road - Phase 3 - BESS; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Elvanfoot, Leadhills Road - Phase 3 - BESS?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 17 April 2026.
Where is Elvanfoot, Leadhills Road - Phase 3 - BESS?
27 km south of Lanark, Strathclyde, United Kingdom (postcode ML12 6TE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).