Planning pack for this site, £295Other options

Solar · United Kingdom

Greenland Hall Farm, Ground Mounted Solar Panels

Operator CS Backhouse

Awaiting ConstructionData checked 16 November 2026Source record dated 25 July 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Greenland Hall Farm, Ground Mounted Solar Panels is a solar farm 6 km north of Thorne, East Riding of Yorkshire, United Kingdom. Its planning application (23/01427/PLF) went to East Riding of Yorkshire on 11 May 2023 and was granted on 14 July 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 42 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Greenland Hall Farm, Ground Mounted Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster21 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof53 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton54 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
CS Backhouse
Location
Greenland Hall Farm, Johnny Moor Long Lane, Rawcliffe Bridge, East Riding of Yorkshire, DN14 8SS, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
23/01427/PLF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01427/PLF, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 11 May 2023 Planning application submitted
  • 14 July 2023 Planning permission granted
  • 14 July 2026 Planning permission expired

None found. The register holds no published incident that names Greenland Hall Farm, Ground Mounted Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Greenland Hall Farm, Ground Mounted Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Greenland Hall Farm, Ground Mounted Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Greenland Hall Farm, Ground Mounted Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 July 2023.
Where is Greenland Hall Farm, Ground Mounted Solar Panels?
6 km north of Thorne, East Riding of Yorkshire, United Kingdom (postcode DN14 8SS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).