Onshore wind · United Kingdom
Goole Fields
Operator RWE npower
Operational32.8 MWData checked 16 November 2026Source record dated 18 August 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Goole Fields is a 32.8 MW wind farm 4.2 km south of Goole, Humberside, United Kingdom. Its planning application (03/01987) went to East Riding of Yorkshire on 1 April 2003 and was granted on 1 September 2003. It has been operating since 11 August 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Goole Fields changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 32.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- RWE npower
- Location
- Goole Fields Parish , East Riding of Yorkshire, Humberside, United Kingdom
- Planning authority
- East Riding of Yorkshire
- Planning application
- 03/01987
- First operating
- 2014
- Turbines
- 16
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 03/01987, with what the planning evidence pack adds for this site.
Every application in East Riding of Yorkshire · Alerts for applications and incidents near here
Timeline
- 1 April 2003 Planning application submitted
- 1 September 2003 Planning permission granted
- 1 March 2012 Construction started
- 11 August 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Goole Fields. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Goole Fields had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Goole Fields; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Goole Fields?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 August 2014.
- Where is Goole Fields?
- 4.2 km south of Goole, Humberside, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).