← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Scottish Government (S36)

Enoch Hill

Operational70 MWApplication EC00005256Submitted 28 September 2015Granted on appeal 13 September 2019

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
EC00005256
Planning authority
Scottish Government (S36)
County or area
Strathclyde
Nation
Scotland
Technology
Onshore wind
Capacity
70 MW
Status
Operational
Operator or applicant
E.ON Renewables
Location
around 14km south west of New Cumnock
Appeal reference
WIN-190-5
Turbines
15, 14.99 m to tip
First operating
2026
  • 28 September 2015 Planning application submitted
  • 21 November 2017 Appeal lodged
  • 13 September 2019 Planning permission granted
  • 13 September 2019 Appeal granted
  • 1 October 2023 Construction started
  • 16 April 2026 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm16 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm23 kmSignificant
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow43 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Enoch Hill is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Scottish Government (S36).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.