Battery storage · United Kingdom
CMU_EN2B-1
Operator RWE RENEWABLES UK ONSHORE WIND LIMITED · Owner Rwe Renewables UK Onshore Wind Limited
Awaiting Construction10 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
CMU_EN2B-1 is a 10 MW battery storage site 14 km south of Cumnock, East Ayrshire, United Kingdom. Its status in the public dataset is awaiting construction. There are 31 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when CMU_EN2B-1 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
RWE RENEWABLES UK ONSHORE WIND LIMITED (03758407), active, since 1999. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for CMU_EN2B-1 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 232 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 232 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 319 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 430 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Battery)
- Capacity
- 10 MW
- Capacity figure from
- Capacity Market register (EMR Delivery Body)
- Status
- Awaiting Construction (Capacity Market unit, delivery year 2029)
- Operator
- RWE RENEWABLES UK ONSHORE WIND LIMITED
- Owner
- Rwe Renewables UK Onshore Wind Limited
- Location
- East Ayrshire, KA18 4PR, United Kingdom
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names CMU_EN2B-1. If you know of one, report it (confidential reports are anonymised).
Questions
- Has CMU_EN2B-1 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names CMU_EN2B-1; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of CMU_EN2B-1?
- Awaiting Construction, in the public dataset.
- Where is CMU_EN2B-1?
- 14 km south of Cumnock, East Ayrshire, United Kingdom (postcode KA18 4PR).
The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).