Onshore wind · United Kingdom

Brochloch Rig (formerly Windy Standard II)

Operator Fred Olsen Renewables · Owner Fred. Olsen Renewables UK Holdings As

Operational90 MWData checked 16 November 2026Source record dated 27 February 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brochloch Rig (formerly Windy Standard II) is a 90 MW wind farm 18 km south of Cumnock, Dumfries and Galloway, United Kingdom. Its planning application (02/n/20002) went to Scottish Government (S36) on 14 December 2001 and was granted on 13 March 2007. It has been operating since 15 June 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 32 other energy sites within 10 km, 26 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 18 other sites and 270 energy sites within 40 km for Brochloch Rig (formerly Windy Standard II)

Members see the sites and incidents around this one, and every record behind them.

FRED. OLSEN RENEWABLES LIMITED (13633932), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
90 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Fred Olsen Renewables
Owner
Fred. Olsen Renewables UK Holdings As
Location
Near New Cummock, Dumfries and Galloway, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
02/n/20002
First operating
2017
Turbines
30, 120 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 02/n/20002, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 14 December 2001 Planning application submitted
  • 13 March 2007 Planning permission granted
  • 7 August 2014 Construction started
  • 15 June 2017 Operational

None found. The register holds no published incident that names Brochloch Rig (formerly Windy Standard II). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Brochloch Rig (formerly Windy Standard II) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Brochloch Rig (formerly Windy Standard II); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Brochloch Rig (formerly Windy Standard II)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 February 2018.
Where is Brochloch Rig (formerly Windy Standard II)?
18 km south of Cumnock, Dumfries and Galloway, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).