Crystal Rig Wind Farm Phase 2a is a 138 MW wind farm 11 km south of Dunbar, Borders, United Kingdom. Its planning application went to Scottish Government (S36) on 17 July 2007 and was granted on 30 July 2008. It has been operating since 25 October 2010. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 18 other sites and 150 energy sites within 40 km for Crystal Rig Wind Farm Phase 2a

Members see the sites and incidents around this one, and every record behind them.

8 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

28 settled days to 4 Nov: 13,409 MWh, running 72% of half hours, peak 67 MW of 138, load factor 14%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £84,066 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

FRED. OLSEN RENEWABLES LIMITED (13633932), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
138 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Fred Olsen Renewables
Owner
Fred. Olsen Renewables UK Holdings As
Location
Dundfar Common, Eastern Lammermuirs, Borders, United Kingdom
Planning authority
Scottish Government (S36)
First operating
2010
Turbines
60

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 17 July 2007 Planning application submitted
  • 30 July 2008 Planning permission granted
  • 1 March 2010 Construction started
  • 25 October 2010 Operational

None found. The register holds no published incident that names Crystal Rig Wind Farm Phase 2a. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Crystal Rig Wind Farm Phase 2a had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crystal Rig Wind Farm Phase 2a; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Crystal Rig Wind Farm Phase 2a?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 October 2010.
Where is Crystal Rig Wind Farm Phase 2a?
11 km south of Dunbar, Borders, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).