Crystal Rig Phase 1

Operator Fred Olsen Renewables · Owner Fred. Olsen Renewables UK Holdings As

Operational62.5 MWData checked 16 November 2026Source record dated 7 April 2010

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Crystal Rig Phase 1 is a 62.5 MW wind farm 13 km south of Dunbar, Borders, United Kingdom. Its planning application (01/00269/FUL) went to Scottish Government (S36) on 1 April 2001 and was granted on 22 January 2003. It has been operating since 30 June 2004. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 18 other sites and 145 energy sites within 40 km for Crystal Rig Phase 1

Members see the sites and incidents around this one, and every record behind them.

FRED. OLSEN RENEWABLES LIMITED (13633932), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
62.5 MW (this record)
All phases
76.3 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Fred Olsen Renewables
Owner
Fred. Olsen Renewables UK Holdings As
Location
Crystal Rig, Scottish Borders, Borders, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
01/00269/FUL
First operating
2004
Turbines
25

This record is 62.5 MW, one part of a site built in phases. With Crystal Rig Wind Farm Phase III (13.8 MW) the phases on the register add up to 76.3 MW. Crystal Rig Wind Farm Phase III

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 01/00269/FUL, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 1 April 2001 Planning application submitted
  • 22 January 2003 Planning permission granted
  • 30 June 2004 Operational

None found. The register holds no published incident that names Crystal Rig Phase 1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Crystal Rig Phase 1 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crystal Rig Phase 1; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Crystal Rig Phase 1?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 7 April 2010.
Where is Crystal Rig Phase 1?
13 km south of Dunbar, Borders, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).