Crystal Rig Wind Farm Phase III

Operator Fred Olsen Renewables · Owner Fred. Olsen Renewables UK Holdings As

Operational13.8 MWData checked 16 November 2026Source record dated 1 June 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Crystal Rig Wind Farm Phase III is a 13.8 MW wind farm 8.3 km south of Dunbar, Borders, United Kingdom. Its planning application went to Scottish Government (S36) on 14 June 2013 and was granted on 18 June 2015. It has been operating since 22 December 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 18 other sites and 157 energy sites within 40 km for Crystal Rig Wind Farm Phase III

Members see the sites and incidents around this one, and every record behind them.

FRED. OLSEN RENEWABLES LIMITED (13633932), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
13.8 MW (this record)
All phases
76.3 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Fred Olsen Renewables
Owner
Fred. Olsen Renewables UK Holdings As
Location
Crystal Rigg Wind Farm, Cranshaws Duns, Scottish Borders, Borders, TD11 3SR, United Kingdom
Planning authority
Scottish Government (S36)
First operating
2016
Turbines
6

This record is 13.8 MW, one part of a site built in phases. With Crystal Rig Phase 1 (62.5 MW) the phases on the register add up to 76.3 MW. Crystal Rig Phase 1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 14 June 2013 Planning application submitted
  • 18 June 2015 Planning permission granted
  • 15 January 2016 Construction started
  • 22 December 2016 Operational

None found. The register holds no published incident that names Crystal Rig Wind Farm Phase III. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Crystal Rig Wind Farm Phase III had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crystal Rig Wind Farm Phase III; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Crystal Rig Wind Farm Phase III?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 June 2018.
Where is Crystal Rig Wind Farm Phase III?
8.3 km south of Dunbar, Borders, United Kingdom (postcode TD11 3SR).