Onshore wind · United Kingdom
Crystal Rig Phase 1 Repowering
Operator Fred Olsen Renewables · Owner Fred. Olsen Renewables UK Holdings As
Application Submitted72 MWData checked 16 November 2026Source record dated 13 October 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Crystal Rig Phase 1 Repowering is a 72 MW wind farm 13 km south of Dunbar, Borders, United Kingdom. Its planning application (ECU00005089) went to Scottish Government (S36) on 17 September 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 31 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Crystal Rig Phase 1 Repowering changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
FRED. OLSEN RENEWABLES LIMITED (13633932), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crystal Rig Phase 1 Repowering sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0441, Wind turbine collapses at Aviva's Pitheavlis site in Perth, 81 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0441 | 2025 | Wind turbine collapses at Aviva's Pitheavlis site in Perth | 81 km | Significant |
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 99 km | Minor |
| EIR-0911 | 2017 | Worker dies after fall from turbine at Whitelee windfarm near Glasgow | 111 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 72 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Fred Olsen Renewables
- Owner
- Fred. Olsen Renewables UK Holdings As
- Location
- Crystal Rig, Scottish Borders, Borders, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00005089
- Turbines
- 10, 230 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00005089, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 17 September 2025 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Crystal Rig Phase 1 Repowering. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Crystal Rig Phase 1 Repowering had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Crystal Rig Phase 1 Repowering; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Crystal Rig Phase 1 Repowering?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 13 October 2025.
- Where is Crystal Rig Phase 1 Repowering?
- 13 km south of Dunbar, Borders, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).