← Back to Strathclyde

Onshore wind · United Kingdom

Afton Wind Farm

Operator InfraRed Capital Partners& E.on

Operational50 MWData checked 16 November 2026Source record dated 2 October 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Afton Wind Farm is a 50 MW wind farm 17 km south of Cumnock, Strathclyde, United Kingdom. Its planning application went to Scottish Government (S36) on 3 November 2004 and was granted on 16 October 2014. It has been operating since 15 February 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 25 of them wind farms. The register holds one incident at this site, the latest in 2018.

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

The cause, the 1 linked record and 291 energy sites within 40 km for Afton Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

28 settled days to 4 Nov: 5,110 MWh, running 79% of half hours, peak 24 MW of 50, load factor 15%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £32,296 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
InfraRed Capital Partners& E.on
Location
To the south west of New Cumnock adjacent to Afton reservoir, Strathclyde, United Kingdom
Planning authority
Scottish Government (S36)
First operating
2018
Turbines
25, 120 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 3 November 2004 Planning application submitted
  • 16 October 2014 Planning permission granted
  • 16 August 2016 Construction started
  • 15 February 2018 Operational

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Afton Wind Farm had a fire or other incident?
Yes. The register holds one incident that names it: Worker dies after becoming stranded at Afton wind farm (EIR-1025, 2018).
What is the status of Afton Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 October 2018.
Where is Afton Wind Farm?
17 km south of Cumnock, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).