Onshore wind · United Kingdom

Windy Rig Wind Farm

Operator Statkraft UK · Owner Ministry Of Trade, Industry And Fisheries

Operational43 MWData checked 16 November 2026Source record dated 23 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Windy Rig Wind Farm is a 43 MW wind farm 21 km south of Cumnock, Dumfries and Galloway, United Kingdom. Its planning application (19/0938/FUL) went to Dumfries and Galloway on 11 June 2019 and was granted on 8 November 2019. It has been operating since 1 October 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 24 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 7 other sites and 261 energy sites within 40 km for Windy Rig Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct5 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 5 Nov: 3,696 MWh, running 67% of half hours, peak 21 MW of 43, load factor 12%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £23,668 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

STATKRAFT UK LTD (05742795), active, since 2006. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
43 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Statkraft UK
Owner
Ministry Of Trade, Industry And Fisheries
Location
Carsphairn, Castle Douglas, Dumfries and Galloway, DG7 3, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
19/0938/FUL
First operating
2021
Turbines
12, 125 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/0938/FUL, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 11 June 2019 Planning application submitted
  • 8 November 2019 Planning permission granted
  • 1 March 2020 Construction started
  • 1 October 2021 Operational

None found. The register holds no published incident that names Windy Rig Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Windy Rig Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Windy Rig Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Windy Rig Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2020.
Where is Windy Rig Wind Farm?
21 km south of Cumnock, Dumfries and Galloway, United Kingdom (postcode DG7 3).