Onshore wind · United Kingdom

Windy Standard I Repower

Operator Fred Olsen Renewables · Owner Fred. Olsen Renewables UK Holdings As

Awaiting Construction49.6 MWData checked 16 November 2026Source record dated 1 October 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Windy Standard I Repower is a 49.6 MW wind farm 17 km south of Cumnock, Dumfries and Galloway, United Kingdom. Its planning application (ECU00003324) went to Scottish Government (S36) on 7 December 2022 and was granted on 26 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 25 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

FRED. OLSEN RENEWABLES LIMITED (13633932), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Windy Standard I Repower sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm21 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm28 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire44 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
49.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Fred Olsen Renewables
Owner
Fred. Olsen Renewables UK Holdings As
Location
Carsphairn Forest, Dumfries and Galloway, DG7, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00003324
Turbines
8, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00003324, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 7 December 2022 Planning application submitted
  • 26 August 2025 Planning permission granted

None found. The register holds no published incident that names Windy Standard I Repower. If you know of one, report it (confidential reports are anonymised).

Has Windy Standard I Repower had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Windy Standard I Repower; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Windy Standard I Repower?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2025.
Where is Windy Standard I Repower?
17 km south of Cumnock, Dumfries and Galloway, United Kingdom (postcode DG7).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).