Onshore wind · United Kingdom
Inverliever
Operator Scottish Power Renewables
Application Refused47.5 MWData checked 16 November 2026Source record dated 24 November 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Inverliever is a 47.5 MW wind farm 19 km south of Oban, Strathclyde, United Kingdom. Its planning application (04/02070/DET) went to Argyll and Bute on 19 November 2002 and was refused on 24 August 2005. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 4 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Inverliever changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 47.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Scottish Power Renewables
- Location
- Inverliever ForestFormer Estate, Strathclyde, United Kingdom
- Planning authority
- Argyll and Bute
- Planning application
- 04/02070/DET
- Turbines
- 17
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 04/02070/DET, with what the planning evidence pack adds for this site.
Every application in Argyll and Bute · Alerts for applications and incidents near here
Timeline
- 19 November 2002 Planning application submitted
- 24 August 2005 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Inverliever. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Inverliever had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Inverliever; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Inverliever?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 24 November 2015.
- Where is Inverliever?