← Back to Strathclyde
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Douglas West Wind Farm (extension)

Operator ScottishPower Renewables (UK) Limited · Owner Scottishpower Renewable Energy Limited

Under Construction78 MWData checked 16 November 2026Source record dated 2 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Douglas West Wind Farm (extension) is a 78 MW wind farm 12 km south-west of Lanark, Strathclyde, United Kingdom. Its planning application (ECU00001836) went to Scottish Government (S36) on 12 April 2019 and was granted on 18 November 2021. Construction started on 1 June 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 59 other energy sites within 10 km, 36 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 5,518 MWh, running 72% of half hours, peak 33 MW of 78, load factor 10%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £39,412 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Douglas West Wind Farm (extension) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm25 kmMajor
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow30 kmMajor
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow35 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
78 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
ScottishPower Renewables (UK) Limited
Owner
Scottishpower Renewable Energy Limited
Location
Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde, ML11 0NN, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00001836
Turbines
13, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00001836, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 12 April 2019 Planning application submitted
  • 18 November 2021 Planning permission granted
  • 1 June 2024 Construction started

None found. The register holds no published incident that names Douglas West Wind Farm (extension). If you know of one, report it (confidential reports are anonymised).

Has Douglas West Wind Farm (extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Douglas West Wind Farm (extension); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Douglas West Wind Farm (extension)?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 March 2026.
Where is Douglas West Wind Farm (extension)?
12 km south-west of Lanark, Strathclyde, United Kingdom (postcode ML11 0NN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).