Onshore wind · United Kingdom
Douglas West and Dalquhandy Renewable Energy Project
Operator Greencoat (formerly 3R Energy&Blue Energy) & BayWa r.e
Operational45 MWData checked 16 November 2026Source record dated 14 October 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Douglas West and Dalquhandy Renewable Energy Project is a 45 MW wind farm 12 km south-west of Lanark, United Kingdom. Its planning application (CL/15/0273) went to South Lanarkshire on 16 July 2015 and was granted on 2 February 2016. It has been operating since 1 January 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 59 other energy sites within 10 km, 36 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Douglas West and Dalquhandy Renewable Energy Project changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 45 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Greencoat (formerly 3R Energy&Blue Energy) & BayWa r.e
- Location
- Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde, Lanarkshire, ML11 0, United Kingdom
- Planning authority
- South Lanarkshire
- Planning application
- CL/15/0273
- First operating
- 2023
- Turbines
- 13, 149.9 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CL/15/0273, with what the planning evidence pack adds for this site.
Every application in South Lanarkshire · Alerts for applications and incidents near here
Timeline
- 16 July 2015 Planning application submitted
- 2 February 2016 Planning permission granted
- 28 March 2021 Construction started
- 1 January 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Douglas West and Dalquhandy Renewable Energy Project. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Douglas West and Dalquhandy Renewable Energy Project had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Douglas West and Dalquhandy Renewable Energy Project; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Douglas West and Dalquhandy Renewable Energy Project?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 October 2025.
- Where is Douglas West and Dalquhandy Renewable Energy Project?
- 12 km south-west of Lanark, United Kingdom (postcode ML11 0).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).