← Back to Strathclyde

Onshore wind · United Kingdom

Hare Hill Extension

Operator Scottish Power Renewables

Operational29.8 MWData checked 16 November 2026Source record dated 2 October 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hare Hill Extension is a 29.8 MW wind farm 13 km south-east of Cumnock, Strathclyde, United Kingdom. Its planning application (07/0809/FL) went to East Ayrshire on 4 September 2007 and was granted on 28 November 2014. It has been operating since 15 September 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 41 other energy sites within 10 km, 34 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 57 other sites and 320 energy sites within 40 km for Hare Hill Extension

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

28 settled days to 4 Nov: 2,468 MWh, running 72% of half hours, peak 15 MW of 30, load factor 12%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £17,271 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
29.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Power Renewables
Location
New Cumnock, East Ayreshire, Strathclyde, United Kingdom
Planning authority
East Ayrshire
Planning application
07/0809/FL
First operating
2016
Turbines
35

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 07/0809/FL, with what the planning evidence pack adds for this site.

Every application in East Ayrshire · Alerts for applications and incidents near here

  • 4 September 2007 Planning application submitted
  • 28 November 2014 Planning permission granted
  • 15 October 2015 Construction started
  • 15 September 2016 Operational

None found. The register holds no published incident that names Hare Hill Extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hare Hill Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hare Hill Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hare Hill Extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 October 2018.
Where is Hare Hill Extension?
13 km south-east of Cumnock, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).