← Back to Strathclyde

Onshore wind · United Kingdom

Middleton Wind Farm

Operator Scottish Power Renewables

Operational12 MWData checked 16 November 2026Source record dated 25 March 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Middleton Wind Farm is a 12 MW wind farm in Newton Mearns, Strathclyde, United Kingdom. Its planning application (2008/0096/TP) went to East Renfrewshire on 11 February 2008 and was granted on 16 August 2011. It has been operating since 4 September 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 57 other energy sites within 10 km, 20 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 57 other sites and 513 energy sites within 40 km for Middleton Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Power Renewables
Location
East Refrewshire, G77 6, Strathclyde, United Kingdom
Planning authority
East Renfrewshire
Planning application
2008/0096/TP
First operating
2013
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2008/0096/TP, with what the planning evidence pack adds for this site.

Every application in East Renfrewshire · Alerts for applications and incidents near here

  • 11 February 2008 Planning application submitted
  • 16 August 2011 Planning permission granted
  • 29 May 2012 Construction started
  • 4 September 2013 Operational

None found. The register holds no published incident that names Middleton Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Middleton Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Middleton Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Middleton Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 March 2015.
Where is Middleton Wind Farm?
In Newton Mearns, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).