Onshore wind · United Kingdom
Middleton Wind Farm
Operator Scottish Power Renewables
Operational12 MWData checked 16 November 2026Source record dated 25 March 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Middleton Wind Farm is a 12 MW wind farm in Newton Mearns, Strathclyde, United Kingdom. Its planning application (2008/0096/TP) went to East Renfrewshire on 11 February 2008 and was granted on 16 August 2011. It has been operating since 4 September 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 57 other energy sites within 10 km, 20 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Middleton Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 12 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Scottish Power Renewables
- Location
- East Refrewshire, G77 6, Strathclyde, United Kingdom
- Planning authority
- East Renfrewshire
- Planning application
- 2008/0096/TP
- First operating
- 2013
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2008/0096/TP, with what the planning evidence pack adds for this site.
Every application in East Renfrewshire · Alerts for applications and incidents near here
Timeline
- 11 February 2008 Planning application submitted
- 16 August 2011 Planning permission granted
- 29 May 2012 Construction started
- 4 September 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Middleton Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Middleton Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Middleton Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Middleton Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 March 2015.
- Where is Middleton Wind Farm?
- In Newton Mearns, Strathclyde, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).