Solar · United Kingdom
Linn Products, Glasgow Road - Solar Panels
Operator Linn Products Limited
Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 17 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Linn Products, Glasgow Road - Solar Panels is a 0.5 MW solar farm on the edge of Clarkston, Strathclyde, United Kingdom. Its planning application (2025/0034/TP) went to East Renfrewshire on 12 February 2025 and was granted on 10 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 68 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Linn Products, Glasgow Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Linn Products, Glasgow Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 62 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 62 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 101 km | Significant |
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 127 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Linn Products Limited
- Location
- Linn Products Limited, Glasgow Road, Eaglesham, Glasgow, Strathclyde, G76 0EP, United Kingdom
- Planning authority
- East Renfrewshire
- Planning application
- 2025/0034/TP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2025/0034/TP, with what the planning evidence pack adds for this site.
Every application in East Renfrewshire · Alerts for applications and incidents near here
Timeline
- 12 February 2025 Planning application submitted
- 10 March 2025 Planning permission granted
- 10 March 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Linn Products, Glasgow Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Linn Products, Glasgow Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Linn Products, Glasgow Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Linn Products, Glasgow Road - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 March 2025.
- Where is Linn Products, Glasgow Road - Solar Panels?
- On the edge of Clarkston, Strathclyde, United Kingdom (postcode G76 0EP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).