Onshore wind · United Kingdom
Torrance Farm
Operator Future Spectrum Ltd
Operational9 MWData checked 16 November 2026Source record dated 18 March 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Torrance Farm is a 9 MW wind farm 3.1 km south-west of Armadale, Strathclyde, United Kingdom. Its planning application (10/00973/FUL) went to North Lanarkshire on 30 August 2010 and was granted on 24 February 2011. It has been operating since 30 December 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 51 other energy sites within 10 km, 39 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Torrance Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Future Spectrum Ltd
- Location
- Blairmuckhill Road, Harthill, North Lanarkshire, Strathclyde, EH48 3AW, United Kingdom
- Planning authority
- North Lanarkshire
- Planning application
- 10/00973/FUL
- First operating
- 2013
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/00973/FUL, with what the planning evidence pack adds for this site.
Every application in North Lanarkshire · Alerts for applications and incidents near here
Timeline
- 30 August 2010 Planning application submitted
- 24 February 2011 Planning permission granted
- 4 February 2013 Construction started
- 30 December 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Torrance Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Torrance Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Torrance Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Torrance Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 March 2014.
- Where is Torrance Farm?
- 3.1 km south-west of Armadale, Strathclyde, United Kingdom (postcode EH48 3AW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).