← Back to Strathclyde

Onshore wind · United Kingdom

Neilston Additional Wind Turbine

Operator Green Energy Wind

Planning Permission Expired2.5 MWData checked 16 November 2026Source record dated 29 July 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Neilston Additional Wind Turbine is a 2.5 MW wind farm 4.1 km south-west of Neilston, Strathclyde, United Kingdom. Its planning application (2014/0130/TP) went to East Renfrewshire on 5 March 2014 and was granted on 4 November 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 26 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

440 energy sites within 40 km for Neilston Additional Wind Turbine

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Green Energy Wind
Location
Field East Of Neilston Community Windfarm Neilston East Renfrewshire, Strathclyde, United Kingdom
Planning authority
East Renfrewshire
Planning application
2014/0130/TP
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2014/0130/TP, with what the planning evidence pack adds for this site.

Every application in East Renfrewshire · Alerts for applications and incidents near here

  • 5 March 2014 Planning application submitted
  • 4 November 2015 Planning permission granted
  • 4 November 2018 Planning permission expired

None found. The register holds no published incident that names Neilston Additional Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Neilston Additional Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Neilston Additional Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Neilston Additional Wind Turbine?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 29 July 2020.
Where is Neilston Additional Wind Turbine?
4.1 km south-west of Neilston, Strathclyde, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).