Onshore wind · United Kingdom
Allt Dearg Wind Farmers LLP
Operator Ormsary and Stronachullin Estates (Allt Dearg Wind Farmers LLP)
Operational10.8 MWData checked 16 November 2026Source record dated 26 February 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Allt Dearg Wind Farmers LLP is a 10.8 MW wind farm 28 km west of Isle of Bute, Strathclyde, United Kingdom. Its planning application (10/02151/PP) went to Argyll and Bute on 17 January 2011 and was granted on 5 April 2011. It has been operating since 25 September 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 7 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Allt Dearg Wind Farmers LLP changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 10.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Ormsary and Stronachullin Estates (Allt Dearg Wind Farmers LLP)
- Location
- Cruach a'Phubuill, 9km south of Ardishaig, South Knapdale, Argyll, Strathclyde, United Kingdom
- Planning authority
- Argyll and Bute
- Planning application
- 10/02151/PP
- First operating
- 2012
- Turbines
- 12
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/02151/PP, with what the planning evidence pack adds for this site.
Every application in Argyll and Bute · Alerts for applications and incidents near here
Timeline
- 17 January 2011 Planning application submitted
- 5 April 2011 Planning permission granted
- 1 December 2011 Construction started
- 25 September 2012 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Allt Dearg Wind Farmers LLP. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Allt Dearg Wind Farmers LLP had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Allt Dearg Wind Farmers LLP; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Allt Dearg Wind Farmers LLP?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 February 2013.
- Where is Allt Dearg Wind Farmers LLP?
- 28 km west of Isle of Bute, Strathclyde, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).